To the central content area

The industrial park sewer system water pollution control and management Project

Absrtact
This is a one-year master regulatory project emphasizing on the management planning for industrial park,with major subjects on industrial park effluent standards、total mass discharge limit、water pollution control zone and prohibited activities、water pollution emergency response system、independent internal auditing and commission of water pollution self-verification、on-line permit application and reporting system,and on-line monitoring web system. This project has accomplished the following results:(1) gathering effluent standards of USA、Germany、Japan、Singapore、Korea for analysis to provide suggestions for new effluent standards for industrial parks, (2) gathering TMDL relevant data from USA、Japan、China、Korea for analysis and comparison to current pollution situation in Taiwan to provide suggestion and example for industrial park of total mass limit for heavy meatal, (3)sampling and analysis of upstream and downstream river water quality or sediment sludge from 18 industrial parks to provide suggestion for industrial park water pollution control zone and prohibited activities for local EPBs’ control reference, (4) proposing suggestions for industrial park emergency response facilities, protocol and permit registration and held one demonstration conference, (5) assisting to provide the list of independent internal auditor and self-verification checklist, plus completion of self-verification analysis, (6)completing industrial park CEMS on–line monitoring web system、information system development and operation guidance,and connecting these on-line systems to 5 demonstration industrial parks with price estimation for future e management and auditing plan, (7) constructing the on-line permit application and discharge reporting web system,documentation reception and permit approval system for EPBs, and statistics reporting system to enhance administrative efficiency and data application.
Keyword
Industrial park,effluent standards,discharge mass limits,prohibited activities for the water pollution control zone,emergency response system,on-line application web system for permit and DMR
Open
top